>> Abstract VOLUME 8. No. 2 (December 1995)
The Seismocup Building System : (Tom Paulay)

In September 1995, on the occasion of ProfessorHugo Bachmann?s 60th.
Birthday, a symposium was held at the Swiss Federal Institute of Technology
in Zurich. The Author of this article, who collaborated with Professor
Bachmann in connection with the development of earthquake requirements
relevant to the needs of Switzerland, was one of the invited speakers.
This article, prepared for the SESOC journal, is the summary of his
presentation.
Cave Creek Viewing Platform Collapse : IPENZ submission to the
Commission of Inquiry : (P.C. Smith)

At the motivation of SESOC and with the assistance of SESOC members
an IPENZ submission was made to the Commission of Inquiry into the Cave
Creek viewing platform collapse. Messrs Smith, Brown & Nimmo were
appointed as the IPENZ representatives to provide the submission. The
brief of the Review Board was not to investigate the technical cause
of the collapse but to ensure that the inquiry was fully aware of the
building control system under which the Cave Creek platform should have
been constructed.

MATERIALS CORNER
Coatings to Enhance Concrete Durability : (A.G. Allan)

There has been minimal consideration by the majority of designers of
the opportunities offered by coatings to meet the requirements of clause
5.3.3.2. of NZS 3101. Coatings can achieve comparable or superior results
to concrete cover. The difference between protective coatings and paint.
Metal Spraying : (Tony Sutherland)

Metal spraying, metallizing or arc sprayed galvanizing is the process
of praying molten zinc onto abrasive blasted steel substrate. It can
also be applied to concrete structure surfaces to protect reinforcing
by Cathodic action. Used on bridge structures and piles.